Monday, April 14, 2014

and now there is a hole

Blessed with amazing weather for our basement cavity dig.




Everyone pitching in to help prep the holes for our support beams, concrete truck was due that same morning.


Our PM, pet manipulator.  


The result of a long day at the job site.

Tomorrow our basement walls will be delivered and set up with a crane.  Wicked rain on Sunday made a horrible mess, and some of our dirt walls sloughed down a bit, hoping we will be okay for wall placement.

It is wonderful that our boys are all old enough to truly help build their home.

Tom was absent this weekend; he and his Aunt Kim ran the River to River 80 mile race!  Their team had 8 people, so everyone basically ran 10 miles, in 3 mile increments, leap frogging along.  They did great.  Tom rocked it!